Wednesday, September 03, 2008

Running way behind schedule - BWOF 07-2008-108

This is my July BWOF project of the month. Given its September, its safe to say I'm running way behind schedule. (I did buy the August issue, but haven't bought September yet. And, I have no plans for the weekend, so maybe some sewing?)

Back to the blouse. This blouse really caught my eye, and the added bonus? 4 pattern pieces - incredibly minimal tracing.

I made a size 38. I removed an inch off the length between my bust and my waist, and took at-least 2 inches off the length at the bottom, since I wanted it to hit precisely at my hip.

Fabric: Ah, the pleasures of sewing from the stash. This was a remnant off some other project from at-least a year ago. I didn't have very much of it, so my inside back yoke is actually a different fabric. But hidden, so it doesn't matter. Also, some kind of synthetic, with a tiny bit of stretch to it.

Can't tell you, since I didn't really look at them. There isn't really that much to this. (Join front yoke to front, back yoke to back, sides to sides, and use the inside yokes as facings to finish the neck edge.) A plus - the curved yoke sewed with minimal fuss and wrinkling, perhaps partly because my fabric has a bit of stretch in it, but also because I was determined that I'd do it over if need be to get it to lie flat. (I only had to rip out an inch or so, so I'm considering that incredibly easy.)

I left off the pockets, since I was looking for instant gratification. I should have made French seams, since this fabric frays really badly, but again, the instant gratification desire ruled. Finally, I left off the back zipper - since my blouse slid over my head without requiring it.

The end result: You tell me - hospital scrubs or beachy, breezy top? I love the pattern though, I'm already plotting to make the dress version, as well as a couple of other tops.


Rachel S said...

Your top looks great! I'm currently sewing up the dress with a light woven and don't like how it's hanging. The top has back darts that the dress doesn't. Did you sew the darts? Think they would make a difference? Thanks!

Kristy said...

Hi Reethi, love this top and looking forward to your next BWOF gem! I've nominated you for a blog award over at my blog, hope it inspires you to keep your creations coming...